Research on post-evaluation of highway main hub general planning

LI De-gang, HUO Ya-min, LUO Xia

China Journal of Highway and Transport ›› 2005, Vol. 18 ›› Issue (2) : 84-89.

PDF Full Text Download(584 KB)
PDF Full Text Download(584 KB)
China Journal of Highway and Transport ›› 2005, Vol. 18 ›› Issue (2) : 84-89.

Research on post-evaluation of highway main hub general planning

  • LI De-gang, HUO Ya-min, LUO Xia
Author information +
History +

Abstract

In order to summarize successful experiences and failure precepts of highway main hub general planning that could be referenced in the adjustment of highway main hub general planning to make it more scientific and more rational, authors propose the conception of highway main hub general planning post-evaluation theory in the first time from the point of view of post-evaluation and based on the research of highway main hub general planning by means of before-after contrast, and the meaning of post-evaluation and the characteristics of highway main hub general planning are elaborated. Post-evaluation theory frame of highway main hub planning and construction is put forward, and its contents, evaluation indexes, evaluation standards and evaluation methods are established, which make the integrated post-evaluation system of highway main hub general planning. This theory and method using in the post-evaluation of the highway main hub general planning of Chengdu is proved to be very effectual.

Key words

traffic engineering / highway main hub / means of before-after contrast / post-evaluation / planning

Cite this article

Download Citations
LI De-gang, HUO Ya-min, LUO Xia. Research on post-evaluation of highway main hub general planning[J]. China Journal of Highway and Transport, 2005, 18(2): 84-89

References

[1] 成都公路主枢纽后评价课题组.成都公路主枢纽后评价[R].成都:四川省交通厅, 2003.
[2] 周 伟, 向前忠.公路网规划后评价的理论与方法[J].中国公路学报, 2003, 16(1):99-104.
[3] 周 伟, 向前忠.陕西省干线公路网规划后评价研究[J].交通运输系统工程与信息, 2003, 3(2):88-93.
[4] 晏远春.公路主枢纽站场布局规划方案模糊综合评价[J].江苏交通科技, 2003, 4(1):6-9.
[5] 张生瑞, 周 伟, 姜彩良, 等.城市客运结构评价体系及评价方法[J].长安大学学报(自然科学版), 2004, 24(4):59-62.
[6] 李晓英, 陈守伦, 袁建国.模糊综合评判法在防洪规划后评价中的应用[J].水电能源科学, 2003, 21(1):58-60.
[7] 梁 军, 江 薇, 李旭宏.模糊综合评价方法改进及其在交通管理规划中的应用[J].交通运输工程学报, 2002, 2(4):68-72.
[8] 成都公路主枢纽总体布局规划课题组.成都公路主枢纽总体布局规划[R].成都:四川省交通厅公路运输管理局, 1996.
PDF Full Text Download(584 KB)

1645

Accesses

0

Citation

Detail

Sections
Recommended

/