Experiment on Installment Tension Technology of Prestressed Concrete Beams

DING Hong-yan, LIU Peng, GUO Yao-hua

China Journal of Highway and Transport ›› 2015, Vol. 28 ›› Issue (11) : 67-72.

PDF Full Text Download(742 KB)
PDF Full Text Download(742 KB)
China Journal of Highway and Transport ›› 2015, Vol. 28 ›› Issue (11) : 67-72.

Experiment on Installment Tension Technology of Prestressed Concrete Beams

  • DING Hong-yan1,2,3, LIU Peng3,4, GUO Yao-hua3
Author information +
History +

Abstract

In order to analyze the influence of installment tension technology on concrete beam prestress loss, bearing capacity and deflection characteristics, aimed at post-tensioned prestressed concrete beam, experimental research on installment tension technology of rectangular prestressed concrete beams was carried out considering the influence of concrete ages and tension methods. Taking the rectangular concrete beams into two groups, one group was tensioned by stages at 4 d, 8 d and 12 d of concrete ages respectively and the other was tensioned once at 28 d of concrete age. Then the continuous thirty days' prestress loss monitoring was processed, and the reciprocating bearing capacity, deflection and failure mode of concrete beams were analyzed. The results show that the prestress loss of concrete at later period can be reduced by prestessed installment tension at early ages while the cracking load and yield load of concrete beams are improved without affecting the bending ductility failure form.

Key words

bridge engineering / concrete beam / experimental research / installment tension / prestress loss

Cite this article

Download Citations
DING Hong-yan, LIU Peng, GUO Yao-hua. Experiment on Installment Tension Technology of Prestressed Concrete Beams[J]. China Journal of Highway and Transport, 2015, 28(11): 67-72

References

[1] 刘翠云,董传洲.国外预应力混凝土连续梁桥发展和施工技术[J].世界桥梁,2011(6):36-39. LIU Cui-yun,DONG Chuan-zhou.Development Tend and Construction Techniques of Foreign PC Continuous Beam Bridges[J].World Bridges,2011(6):36-39.
[2] 谢峻,王国亮,郑晓华.大跨径预应力混凝土箱梁桥长期下挠问题的研究现状[J].公路交通科技,2007,24(1):47-50. XIE Jun,WANG Guo-liang,ZHENG Xiao-hua.State of Art of Long-term Deflection for Long Span Prestressed Concrete Box-girder Bridge[J].Journal of Highway and Transportation Research and Develop-ment,2007,24(1):47-50.
[3] 胡狄,陈政清.预应力混凝土桥梁收缩与徐变变形试验研究[J].土木工程学报,2003,36(8):80-85. HU Di,CHEN Zheng-qing.Experimental Research on the Deformations for Shrinkage and Creep of Beams in Prestressed Concrete Bridges[J].China Civil Engineering Journal,2003,36(8):80-85.
[4] 黄海东,向中富,郑皆连.PC箱梁桥三维徐变效应精细化分析[J].中国公路学报,2013,26(5):108-114. HUANG Hai-dong,XIANG Zhong-fu,ZHENG Jie-lian.Refined Analysis of Three-dimensional Creep Effect for PC Box-girder Bridges[J].China Journal of Highway and Transport,2013,26(5):108-114.
[5] CHENG Xiao-dong,LI Guang-yu,YE Gui-ru.Three-dimensional Nonlinear Analysis of Creep in Concrete Filled Steel Tube Columns[J].Journal of Zhejiang University:Science A,2005,6(8):826-835.
[6] 齐东春,张永水,李强.大跨径连续刚构桥跨中下挠的成因及对策[J].重庆交通大学学报:自然科学版,2007,26(6):46-49. QI Dong-chun,ZHANG Yong-shui,LI Qiang.Reason Analysis and Countermeasures for Excessive Deflection of Midspan in Long-span Continuous Rigid Frame Bridges[J].Journal of Chongqing Jiao Tong University:Natural Science,2007,26(6):46-49.
[7] LI X P,ROBERTSON I N.Long-term Performance Predictions of the North Halawa Valley Viaduct[R].Honolulu:University of Hawaii,2003.
[8] GB/T 50152-2012,混凝土结构试验方法标准[S]. GB/T 50152-2012,Standard for Test Method of Concrete Structures[S].
[9] 方志,汪建群,何鑫,等.预应力混凝土简支箱梁受力性能足尺模型试验[J].中国公路学报,2011,24(6):49-56. FANG Zhi,WANG Jian-qun,HE Xin,et al.Full-scale Model Test of Loading Behaviour of Prestressed Concrete Simply Supported Box Girders[J].China Journal of Highway and Transport,2011,24(6):49-56.
[10] 葛继平,王志强,彭大文,等.重复荷载下高铁24 m箱梁模型试验研究[J].武汉理工大学学报:交通科学与工程版,2013,37(4):741-744. GE Ji-ping,WANG Zhi-qiang,PENG Da-wen,et al.Experimental Research on the Static Performance of High-speed Railway Box Girder Model Under Repeated Loading[J].Journal of Wuhan University of Technology:Transportation Science and Engineering,2013,37(4):741-744.
PDF Full Text Download(742 KB)

1422

Accesses

0

Citation

Detail

Sections
Recommended

/