Influencing Factors and Optimization of Deformation Joint Set in Gongbei Tunnel Open Excavation Section

HUANG Ming-li, XIONG Hao-xiang, SHEN Qiao-feng, ZHOU Yi, TAN Zhong-sheng

China Journal of Highway and Transport ›› 2016, Vol. 29 ›› Issue (12) : 124-133.

PDF Full Text Download(2577 KB)
PDF Full Text Download(2577 KB)
China Journal of Highway and Transport ›› 2016, Vol. 29 ›› Issue (12) : 124-133.

Influencing Factors and Optimization of Deformation Joint Set in Gongbei Tunnel Open Excavation Section

  • HUANG Ming-li1, XIONG Hao-xiang2, SHEN Qiao-feng1, ZHOU Yi1, TAN Zhong-sheng1
Author information +
History +

Abstract

In order to solve the problem of influence factors and spacing optimization in arrangement of deformation joint in open excavation of tunnel structure, based on the Gongbei Tunnel engineering, open excavation tunnel was selected to carry out. Using numerical simulation methods, 3D load-structure model of tunnel construction joint was established to investigate the influencing mechanisms of geological factor, temperature factor and variation of structure, and further to investigate the spacing optimization for deformation joints. The results show that arrangements of deformation joints can solve the non-uniform deformation of tunnel and optimize the stress state of structure, while the waterproof difficulty of structure was increased. The main geological factor influencing the deformation joint setting is the different grades of the surrounding rock in the structure; setting deformation joint is necessary for considering the influence of temperature; considering the influences of temperature difference on deformation joint setting, the joints should be arranged when the temperature difference between inside and outside the structure is large. The setting distance of deformation joint in open excavation section 4 of Gongbei Tunnel is 100 m, a total of 56 deformation joints are set in originally designed open excavation section which becomes 36 after calculating and optimizing, reducing about 35.7%. The optimum segment covers a length of 529 m, accounting for 43.2% of the entire sea segment.

Key words

tunnel engineering / open-cut underground structure / numerical simulation / deformation joint / influencing factor / setting distance

Cite this article

Download Citations
HUANG Ming-li, XIONG Hao-xiang, SHEN Qiao-feng, ZHOU Yi, TAN Zhong-sheng. Influencing Factors and Optimization of Deformation Joint Set in Gongbei Tunnel Open Excavation Section[J]. China Journal of Highway and Transport, 2016, 29(12): 124-133

References

[1] 刘强,彭焱森,谭忠盛,等.隧道明挖段变形缝间距的优化[J].北京交通大学学报,2015,39(4):88-95. LIU Qiang,PENG Yan-sen,TAN Zhong-sheng,et al.Optimization of the Deformation Joint Distance in Tunnel Open Excavation Section[J].Journal of Beijing Jiaotong University,2015,39(4):88-95.
[2] 周艺.明挖地下结构影响变形缝设置因素研究及工程应用[D].北京:北京交通大学,2015. ZHOU Yi.Research of Factors Influencing the Deformation Joint Set in Open-cut Underground Structures and Engineering Applications[D].Beijing:Beijing Jiaotong University,2015.
[3] 闫静雅,张子新,黄宏伟,等.桩基础荷载对邻近已有隧道影响的有限元分析[J].岩土力学,2008,29(9):2508-2514. YAN Jing-ya,ZHANG Zi-xin,HUANG Hong-wei,et al.Finite Element Analysis of Influence of Pile Group Loading on Existing Neighboring Tunnels[J].Rock and Soil Mechanics,2008,29(9):2508-2514.
[4] 闫静雅.桩基础全寿命期对邻近已有隧道的影响研究[D].上海:同济大学,2007. YAN Jing-ya.The Influence of Pile Foundation in Life-cycle on Adjacent Existing Tunnel[D].Shanghai:Tongji University,2007.
[5] 楼晓明,金志靖.钻孔灌注桩基础对紧邻地铁隧道产生竖向附加应力和变形的计算分析[J].岩土力学,1996,17(3):48-53. LOU Xiao-ming,JIN Zhi-jing.Analysis of the Influence of Bored Pile Foundation on Adjacent Metro Tunnels[J].Rock and Soil Mechanics,1996,17(3):48-53.
[6] 楼晓明,刘建航.高层建筑桩基础对邻近隧道影响的监测与分析[J].同济大学学报:自然科学版,2003,31(9):1014-1018. LOU Xiao-ming,LIU Jian-hang.Monitoring and Analysis of Influence of Pile Foundation Under High-rise Buildings on Adjacent Tunnel[J].Journal of Tongji University:Natural Science,2003,31(9):1014-1018.
[7] 余晶,程勇,贾瑞华.港珠澳大桥珠海连接线拱北隧道方案论证[J].现代隧道技术,2012,49(1):119-125,131. YU Jing,CHENG Yong,JIA Rui-hua.Option Demonstration for the Gongbei Tunnel at the Zhuhai Link of the Hong Kong-Zhuhai-Macau Bridge[J].Modern Tunnelling Technology,2012,49(1):119-125,131.
[8] 何小龙,程勇,郭小红,等.港珠澳大桥珠海连接线工程拱北隧道设计[J].土工基础,2013,27(1):21-24,40. HE Xiao-long,CHENG Yong,GUO Xiao-hong,et al.Gongbei Tunnel Design of Hong Kong-Zhuhai-Macao Bridge Connector Project[J].Soil Engineering and Foundation,2013,27(1):21-24,40.
[9] GB 50108-2008,地下工程防水技术规范[S]. GB 50108-2008,Technical Code for Waterproofing of Underground Works[S].
[10] 沈春林,周俊,李芳,等.地下防水设计与施工[M].北京:化学工业出版社,2003. SHEN Chun-lin,ZHOU Jun,LI Fang,et al.Underground Waterproof Design and Construction[M].Beijing:Chemical Industry Press,2003.
[11] 冯振国.地下车站变形缝设计讨论[J].铁路建筑技术,2012(增2):95-97. FENG Zhen-guo.Discussion of Underground Station Deformation Joint Design[J].Railway Construction Technology,2012(S2):95-97.
[12] 韩忠存.隧道及地下工程结构防排水技术的发展和应用[J].隧道建设,2001,21(2):1-6. HAN Zhong-cun.Development and Application of the Tunnel and Underground Engineering Structures on Drainage Technology[J].Tunnel Construction,2001,21(2):1-6.
[13] 周立霞,王昱之,王起才.隧道衬砌施工缝、变形缝防水技术现状[J].兰州铁道学院学报:自然科学版,2003,22(4):101-104. ZHOU Li-xia,WANG Yu-zhi,WANG Qi-cai.The Waterproofing Status Quo of Construction and Deformation Cracks in Tunnel Concrete Liner[J].Journal of Lanzhou Railway University:Natural Sciences,2003,22(4):101-104.
[14] 卓越,邹翀,闫自海.特长公路隧道取消变形缝试验研究[J].中国工程科学,2009,11(7):59-65. ZHUO Yue,ZOU Chong,YAN Zi-hai.Long Highway Tunnel Experimental Study on the Abolition of Deformation Joint[J].Engineering Sciences,2009,11(7):59-65.
[15] BLINDHEIM O T,GRØV E,NILSEN B.Nordic Sub Sea Tunnel Projects[J].Tunnelling and Underground Space Technology,2005,20(6):570-580.
PDF Full Text Download(2577 KB)