Optimization Method for Installation Timing of Secondary Lining in Mechanized Tunnel Construction Using Drilling and Blasting Method
CHEN Zi-quan, SUN Zhen-yu, ZHOU Zi-han, LI Tian-sheng, WANG Bo, XU Guo-wen, JIANG Chang-wei
China Journal of Highway and Transport . 2024, (7): 70 -81 .  DOI: 10.19721/j.cnki.1001-7372.2024.07.006