以轴压比为主要参数, 进行了8个圆钢管混凝土构件滞回性能的试验研究。采用数值方法计算了圆钢管混凝土构件的弯矩—曲率及水平荷载—水平位移滞回关系曲线, 理论计算结果与试验结果吻合较好。在系统考察了轴压比、长细比、含钢率、钢材屈服强度和混凝土强度等参数对圆钢管混凝土构件滞回曲线骨架线影响规律的基础上, 提出了弯矩—曲率和水平荷载—水平位移滞回关系模型以及位移延性系数的简化确定方法。
Abstract
The hysteretic behaviors of eight beam-columns of concrete-filled circular steel tubes are experimentally investigated in this paper, and the main parameter is axial load level.Relation curves of the moment versus curvature and the lateral load versus lateral displacement of concrete-filled circular steel members are calculated by using numerical method, and the calculating results agree well with experimental results.Based on the investigations for influence of several parameters on hysteretic curves of circular steel tubes, such as, the axial load level, slenderness ratio, steel ratio, strength of the materials, etc, hysteretic models for the moment versus curvature relationship, the lateral load versus lateral displacement relationship and simplified formula of ductility coefficient are suggested.
关键词
桥梁工程 /
滞回性能 /
试验研究 /
钢管混凝土压弯构件 /
滞回模型 /
延性
{{custom_keyword}} /
Key words
bridge engineering /
hysteretic behavior /
experimental research /
beam column of concrete-filled steel tube /
hysteretic model /
ductility
{{custom_keyword}} /
中图分类号:
U441
{{custom_clc.code}}
({{custom_clc.text}})
{{custom_sec.title}}
{{custom_sec.title}}
{{custom_sec.content}}
参考文献
[1] AVAL S B B, SAADEGHVAZIRI M A, GOLAFSHANI A A.Comprehensive composite inelastic fiber element for cyclic analysis of concrete-filled steel tube columns[J].Journal of Engineering Mechanics, ASCE, 2002, 128 (4):428-437.
[2] ELREMAILY A, AZIZINAMINI A.Behavior and str-ength of circular concrete-filled tube columns[J].Journal of Constructional Steel Research, 2002, 58(7):1 567-1 591.
[3] FUJINAGA T, MATSUI C, TSUDA K, YAMAJI Y.Limiting axial compressive force and structural performance of concrete filled steel circular tubular beam-columns[A].Proceedings of the Fifth Pacific Structural Steel Conference[C].Seoul:Korea Steel Institution, 1998.979-984.
[4] PRION H G L, BOEHME J.Beam-column behaviour of steel tubes filled with high strength concrete[J].Canadian Journal of Civil Engineering, 1994, 21(3):207-218.
[5] 屠永清.钢管混凝土压弯构件恢复力特性的研究[D].哈尔滨:哈尔滨建筑大学, 1994.
[6] 钟善桐. 高层钢管混凝土结构[M].哈尔滨: 黑龙江科学技术出版社, 1999.
[7] HAN L H, YANG Y F, TAO Z.Concrete-filled thin walled steel RHS beam-columns subjected to cyclic loading[J].Thin-walled Structures, 2003, 41(9):801-833.
[8] ATC-24, Guidelines for cyclic seismic testing of components of steel structures[S].
[9] DBJ 13-51-2003, 福建省工程建设地方标准[S].
[10] 韩林海.钢管混凝土结构[M].北京: 科学出版社, 2000.
[11] ACI 318-99, Building code requirements for structural concrete and commentary[S].
[12] AIJ.Recommendations for Design and Construction of Concrete Filled Steel Tubular Structures[M].Tokyo:Architectural Institute of Japan, 1997.
[13] AISC.Load and Resistance Factor Design Specificat-oin for Structural Steel Buildings[M].Chicago:AISC, 1999.
[14] BS 5400, Concrete and composite bridges[S].
[15] DD ENV 1994-1-1:1994, Design of composite steel and concrete structures[S].
[16] DL/T 5085-1999, 钢-混凝土组合结构设计规程[S].
[17] SHAMS M, SAADEGHVAZIRI M A.State of the art of concrete-filled steel tubular columns[J].ACI Structural Journal, 1997, 94(5):558-571
[18] 杨有福, 韩林海.圆钢管混凝土压弯构件弯矩-曲率滞回模型研究[J].地震工程与工程振动, 2004, 24(1):186-192.
[19] 杨有福, 韩林海.圆钢管混凝土压弯构件荷载-位移滞回模型研究[J].地震工程与工程振动, 2003, 23(6):117-123.
{{custom_fnGroup.title_cn}}
脚注
{{custom_fn.content}}
基金
福建省科技计划重大项目(2002H007):国家建设部科学计划项目(04-2-151)
{{custom_fund}}
{{custom_fund}}