支架现浇大曲率斜拉桥初始索力确定方法

张柳煜,刘来君,杨利峰

中国公路学报 ›› 2010, Vol. 23 ›› Issue (3) : 58-63.

PDF全文下载(519 KB)
PDF全文下载(519 KB)
中国公路学报 ›› 2010, Vol. 23 ›› Issue (3) : 58-63.
论文

支架现浇大曲率斜拉桥初始索力确定方法

  • 张柳煜1,刘来君1,杨利峰2
作者信息 +

Method of Determining Initial Cable Forces for Large Curvature Cable-stayed Bridge with Full Framing Cast-in-place

  • ZHANG Liu-yu1, LIU Lai-jun1, YANG Li-feng2
Author information +
文章历史 +

摘要

为确定支架现浇大曲率斜拉桥在恒载作用下的初始索力,以主梁及索塔的弯曲、拉压和扭转应变能之和作为目标函数,考虑位移、弯矩、索力等多种约束条件,结合有限元模型确定全桥各单元内力、位移的高阶影响矩阵,并运用MATLAB中有效集法求解目标函数,从而得出了初始索力。实桥应用结果表明:该方法对支架现浇大曲率斜拉桥有良好的适用性,精度满足工程要求且应用简便,实用可靠,易于推广。

Abstract

In order to determine initial cable forces of large curvature cable-stayed bridge with full framing cast-in-place under constant load, authors used the bending, torsion, tension and compression strain energy of main girder and cable-tower as objective function. Considered constraint condition, such as displacement, bending moment, cable force, finite element model was used to define internal force and to get displacement influence matrix, objective function was solved and initial cable force was got based on active set method in MATLAB. Application result of test bridge indicates that this method which can be used in large curvature cable-stayed bridge with full framing cast-in-place is simple and convenient. It is also easy to be generalized. The precision calculated by the method satisfies engineering requirements.

关键词

桥梁工程 / 大曲率斜拉桥 / 有效集法 / 支架现浇 / 索力 / 应变能

Key words

bridge engineering / large curvature cable-stayed bridge / active set method / full framing cast-in-place / cable force / strain energy

引用本文

导出引用
张柳煜,刘来君,杨利峰. 支架现浇大曲率斜拉桥初始索力确定方法[J]. 中国公路学报, 2010, 23(3): 58-63
ZHANG Liu-yu, LIU Lai-jun, YANG Li-feng. Method of Determining Initial Cable Forces for Large Curvature Cable-stayed Bridge with Full Framing Cast-in-place[J]. China Journal of Highway and Transport, 2010, 23(3): 58-63
中图分类号: U448.27   

参考文献

[1] 范立础.桥梁工程:上册[M].北京:人民交通出版社,2001.
FAN Li-chu.Bridge Engineering:Volume Ⅰ[M].Beijing:China Communications Press,2001.
[2]周绪红,戴 鹏,狄 谨.钢箱梁斜拉桥成桥索力优化分析[J].建筑科学与工程学报,2007,24(2):19-23.
ZHOU Xu-hong,DAI Peng,DI Jin.Optimization Analysis of Cable Tensions of Dead Load State for Cable-stayed Bridge with Steel Box Girder[J].Journal of Architecture and Civil Engineering,2007,24(2):19-23.
[3]陈德伟,范立础.确定预应力混凝土斜拉桥恒载初始索力的方法[J].同济大学学报:自然科学版,1998,26(2):120-124.
CHEN De-wei,FAN Li-chu.Optimization of Initial Cable Forces in Prestressed Concrete Cable-stayed Bridges[J].Journal of Tongji University:Natural Science,1998,26(2):120-124.
[4]WANG P H,TSENG T C,YANG C G.Initial Shape of Cable-stayed Bridges[J].Computers & Structures,1993,47(1):111-124.
[5]肖汝诚,项海帆.斜拉桥索力优化的影响矩阵法[J].同济大学学报:自然科学版,1998,26(3):235-240.
XIAO Ru-cheng,XIANG Hai-fan.Influence Matrix Method of Cable Tension Optimization for Cable-stayed Bridges[J].Journal of Tongji University:Natural Science,1998,26(3):235-240.
[6]肖汝诚,郭文复.结构关心截面内力、位移混合调整计算的影响矩阵法[J].计算结构力学及其应用,1992,9(1):91-99.
XIAO Ru-cheng,GUO Wen-fu.Influence Matrices Method for Structural Adjustment Calculation of Internal Forces and Displacements of Concern Sections[J].Computational Structural Mechanics and Applications,1992,9(1):91-99.
[7]梁 鹏,肖汝诚,张雪松.斜拉桥索力优化实用方法[J].同济大学学报:自然科学版,2003,31(11):1270-1274.
LIANG Peng,XIAO Ru-cheng,ZHANG Xue-song.Practical Method of Optimization of Cable Tensions for Cable-stayed Bridges[J].Journal of Tongji University:Natural Science,2003,31(11):1270-1274.
[8]黄 侨,吴红林,杨大伟.确定斜拉桥成桥索力多约束条件下最小能量法[J].哈尔滨工业大学学报,2007,39(2):288-291.
HUANG Qiao,WU Hong-lin,YANG Da-wei.Min-imum Energy Method with Multi-restrictions to Decide the Rational Completed Stage Force[J].Journal of Harbin Institute of Technology,2007,39(2):288-291.
[9]梁 鹏,徐 岳,刘永健.斜拉索分析统一理论及其应用[J].建筑科学与工程学报,2006,23(1):68-77.
LIANG Peng,XU Yue,LIU Yong-jian.Unified An-alysis Theory of Cable Stay and Its Applications[J].Journal of Architecture and Civil Engineering,2006,23(1):68-77.
[10]李凤臣,刘 青,王大鹏,等.斜拉索索力识别精度的提高方法[J].建筑科学与工程学报,2008,25(4):42-46.
LI Feng-chen,LIU Qing,WANG Da-peng,et al.Tension Identification Precision Enhancement Method for Stay Cable[J].Journal of Architecture and Civil En-gineering,2008,25(4):42-46.
[11]修乃华.一类改进的非凸二次规划有效集方法[J].计算数学,1994(4):406-417.
XIU Nai-hua.A Class of Improved Active Set Methods for Nonconvex Quadratic Programming Problem[J].Mathematica Numerica Sinica,1994(4):406-417.
[12]赵瑞安,吴 方.非线性最优化理论和方法[M].杭州:浙江科学技术出版社,1992.
ZHAO Rui-an,WU Fang.Theory and Methods for Nonlinear Optimization[M].Hangzhou:Zhejiang Science and Technology Press,1992.

基金

国家西部交通建设科技项目(2004 318 822 25)
PDF全文下载(519 KB)

1513

Accesses

0

Citation

Detail

段落导航
相关文章

/