不同跨径桥梁车辆荷载分项系数及可靠度

杨晓艳, 贡金鑫, 冯云芬

中国公路学报 ›› 2015, Vol. 28 ›› Issue (6) : 59-66.

PDF全文下载(465 KB)
PDF全文下载(465 KB)
中国公路学报 ›› 2015, Vol. 28 ›› Issue (6) : 59-66.
桥梁与隧道工程

不同跨径桥梁车辆荷载分项系数及可靠度

  • 杨晓艳1, 贡金鑫1, 冯云芬2
作者信息 +

Partial Factors of Vehicle Loads and Reliability Analysis of Bridges with Different Spans

  • YANG Xiao-yan1, GONG Jin-xin1, FENG Yun-fen2
Author information +
文章历史 +

摘要

以可靠度理论和实测车辆荷载数据为基础,推导了考虑桥梁跨径对车辆荷载分项系数的影响。根据近年中国车辆荷载实测数据,对不同跨径简支和连续桥梁的车辆荷载效应进行计算,建立车辆荷载效应的概率模型;按照相同超越概率的原则,得到不同跨径桥梁车辆荷载效应标准值的跨径影响系数,在此基础上确定了不同跨径桥梁结构的车辆荷载分项系数与跨径的关系,并采用一次二阶矩可靠度方法计算了其可靠指标。结果表明:按相同超越概率原则确定的车辆荷载效应标准值的跨径影响系数和车辆荷载分项系数随桥梁跨径的减小而增大;给出的考虑跨径影响的车辆荷载分项系数计算公式更合理。

Abstract

Based on reliability theory and recently measured vehicle load data, the influence of bridge span on partial factors of vehicle load was derived. According to recently vehicle load data measured in China, the vehicle load effects of multi-span simply supported and continuous two-equal span bridges were calculated, as well as the probability models were founded. In accordance to the principle of the same exceeding probability, influence factors of span for characteristic values of vehicle load effects with various spans were obtained, based on which, the relationship between the partial factors of vehicle load effects and the span of bridge was determined. Reliability analysis for bridge design as per the determined vehicle load partial factor-span relationship was made with First-order Second-moment method (FOSM). The results show that the span influence factor and vehicle load partial factor for characteristic value of vehicle load effect, which were determined based on the equal exceeding probability, increase with the decrease of the span of bridge. The proposed span dependent partial factor calculation formula for vehicle load for bridge design is more reasonable.

关键词

桥梁工程 / 荷载效应 / 概率模型 / 分项系数 / 可靠度

Key words

bridge engineering / load effect / probability model / partial factor / reliability

引用本文

导出引用
杨晓艳, 贡金鑫, 冯云芬. 不同跨径桥梁车辆荷载分项系数及可靠度[J]. 中国公路学报, 2015, 28(6): 59-66
YANG Xiao-yan, GONG Jin-xin, FENG Yun-fen. Partial Factors of Vehicle Loads and Reliability Analysis of Bridges with Different Spans[J]. China Journal of Highway and Transport, 2015, 28(6): 59-66
中图分类号: U441.2   

参考文献

[1] 贡金鑫, 李文杰, 赵君黎, 等.公路桥梁车辆荷载概率模型研究(一)——非治超地区[J].公路交通科技, 2010, 27(6): 40-45, 57. GONG Jin-xin,LI Wen-jie,ZHAO Jun-li,et al.Research on Probabilistic Model of Highway Bridge Vehicle Loads (1)—Non-controlling Area[J].Journal of Highway and Transportation Research and Development,2010,27(6):40-45,57.
[2] 贡金鑫, 李文杰, 赵君黎, 等.公路桥梁车辆荷载概率模型研究(二)——计重收费地区和强制治超地区[J].公路交通科技, 2010, 27(7): 56-60. GONG Jin-xin,LI Wen-jie,ZHAO Jun-li,et al.Research on Probabilistic Model of Highway Bridge Vehicle Loads(2)—Toll-by-weight Area and Overload Controlling Area[J].Journal of Highway and Transportation Research and Development,2010,27(7):56-60.
[3] LIU Xiao-gang,FAN Jian-sheng,NIE Jian-guo,et al.Behavior of Composite Rigid Frame Bridge Under Bi-directional Seismic Excitations[J].Journal of Traffic and Transportation Engineering:English Edition,2014,1(1):62-71.
[4] JTG D60—2004, 公路桥涵设计通用规范[S]. JTG D60—2004,General Code for Design of Highway Bridges and Culverts[S].
[5] 贡金鑫, 杨晓艳, 贺拴海, 等.荷载组合方法与系数的研究[R].北京:中交公路规划设计院有限公司, 2011. GONG Jin-xin,YANG Xiao-yan,HE Shuan-hai,et al.Research on Load Combination Method and Coefficient[R].Beijing:CCCC Highway Consultants Co.,Ltd.,2011.
[6] 逯一新, 赵君黎, 张启伟, 等.桥梁设计荷载与安全鉴定荷载的研究[R].北京: 中交公路规划设计院有限公司, 2012. LU Yi-xin,ZHAO Jun-li,ZHANG Qi-wei,et al.Research on Design Load for Bridge and Load Security Identification[R].Beijing:CCCC Highway Consultants Co.,Ltd.,2012.
[7] 梅 刚, 秦 权, 林道锦.公路桥梁车辆荷载的双峰分布概率模型[J].清华大学学报: 自然科学版, 2003, 43(10): 1394-1396,1404. MEI Gang,QIN Quan,LIN Dao-jin.Bi-modal Probabilistic Model of Highway and Bridge Vehicle Loads[J].Journal of Tsinghua University: Science and Technology,2003,43(10):1394-1396,1404.
[8] MIAO T J,CHAN T H T.Bridge Live Load Models from WIM Data[J].Engineering Structures,2002,24(8):1071-1084.
[9] NOWAK A S.Calibration of LRFD Bridge Design Code[M].Washington DC:National Academy Press,1999.
[10] JORDAN P,CHRISTOPHER H.Calibration of LRFD Live Factors Using Weigh-in-motion Data[R].Washington DC:Oregon Department of Transportation Research Unit,2006.
[11] 张建仁.基于概率理论的荷载分项系数分析研究[J].中国公路学报, 1993, 6(1): 55-60,72. ZHANG Jian-ren.Analysis of Partial Load Factors Based on Probability Theory[J].China Journal of Highway and Transport,1993,6(1):55-60,72.
[12] WANG Tao,HAN Wan-shui,YANG Fei,et al.Wind-vehicle-bridge Coupled Vibration Analysis Based on Random Traffic Flow Simulation[J].Journal of Traffic and Transportation Engineering:English Edition,2014,1(4):293-308.
[13] 孙 婧.中小跨径梁桥荷载基本组合分项系数研究[D].西安: 长安大学,2011. SUN Jing.Analysis on Partial Safety Factor of the Loads Basic Combination of Small and Medium Span Bridges[D].Xi'an:Chang'an Univeristy,2011.
[14] GB 50153—2008, 公路工程结构可靠度设计统一标准[S]. GB 50153—2008,Unified Standard for Reliability Design of Highway Engineering Structures[S].
[15] 贡金鑫,魏巍巍.工程结构可靠性设计原理[M].北京:机械工业出版社,2007. GONG Jin-xin,WEI Wei-wei.Reliability Design Theory for Engineering Structures[M].Beijing:China Machine Press,2007.

基金

国家重点基础研究发展计划(“九七三”计划)项目(2015CB057703)
PDF全文下载(465 KB)

1650

Accesses

0

Citation

Detail

段落导航
相关文章

/